Sanitary SS Piping Installation: Kellogg’s – The EGGO Company, Blue Anchor, NJ

Installation of sanitary process equipment provided by Kellogg’s, SS sanitary piping and piping related items.

Freezer Heat Exchanger Sanitary System and the Batter Heat Exchanger System
Assisted with unloading the equipment from the delivery truck, uncrate, dispose of the
crating material, and set the heat exchangers in the orientation, location shown on the drawings.

Fabricate and install SS support brackets for the heat exchangers as per the drawings.

Provide and install 4” SS Sanitary Tubing from the two Freezer CIP Systems to the new
Freezer Heat Exchanger Infeed Valve. Install the new 4” Freezer Heat Exchanger Infeed Valve with Tri-Clamp fittings at the end of the piping.

Provide and install 2” SS Sanitary Piping from the Batter CIP pump to the new Batter Heat Exchanger infeed.

COP Tank Heater Sanitary Piping
Modify the COP Tank Piping to accept the new in-line heater provided by Kellogg’s. Provide and install the new heater with Tri-Clamp fittings and Sanitary Piping.

Wash Tank Heater Sanitary Piping
Modify the COP Tank Piping to accept the new in-line heater provided by Kellogg’s. Provide and install the new heater with Tri-Clamp fittings and Sanitary Piping.

Batter CIP Piping Upgrades
Provide and install modifications to the 2-3” SS Sanitary Batter CIP Piping to eliminate the dead leg dip and provide a continuous drainage to the CIP Return Tank.

Mix Proof Valves
Remove the existing Valve Manifold using the Tri-Clamp fittings. Install the new Mix
Proof Valve Manifold provided by Kellogg’s to the outfeed Tri-Clamp fittings. Modify the
existing Batter System 1 and Batter System 2 infeed piping to fit to the new Mix Proof Valve matrix.